Resident | Visitor | Business | Employee | Government
 
space
Miami-Dade Public Library System
miamidade.govspace
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | About Us | Ask a Librarian | Contact Us | Locations | My Account miamidade.gov
    space
    space
    Catalog & Reference space
  • Databases & More
  • Download Books & Music
  • Library Catalog
  • MyLibraryService.org
  •   
    space
    Events and Programs space
  • Art of Storytelling
  • Computer Classes
  • Events Calendar
  • Kids
  • Parents and Teachers
  • Teens
  •   
    space
    Outreach & Literacy space
  • Art @ the Library
  • Assistive Technologies
  • Connections
  • Jumpstart
  • Mobile Library
  • Project L.E.A.D.
  • S.M.A.R.T.
  • Talking Books Library
  •   
    space space
    Print Print
    space
    space
    Welcome to the Miami-Dade Public Library System

     

    Watch Us Grow - Building Beyond Books

    In 2008, four new branch libraries, currently in different stages of construction, will open in the areas of International Mall, Kendale Lakes, Pinecrest and in Coconut Grove's Elizabeth Virrick Park. Groundbreakings for the construction of future libraries in the communities of Palmetto Bay, Arcola Lakes and a new Hispanic Branch in Little Havana will also take place in 2008. A groundbreaking for the Naranja Branch Library was held in 2007. Now currently under construction, the branch will open in 2009. Watch to find out more about Business and Science
    Watch to find out more about Building Beyond Books
     

    International Mall
    What: International Mall Branch Library
    Where: 10315 NW 12th Street
    Building Size: 7,500 square feet
    Estimated Construction Completion: March 2008
    Estimated Opening Date: May 2008
    Estimated Cost: $ 4 million. Second library to be built since the Main Library opened in 1985.
    Computers: 26 PC's & 12 laptops in a WiFi environment.
    Self-checkout Terminals Patrons will be able to check out their own books.
    Special Features: Green space (canopied outdoor area to be used for story time and special programs during the cooler months). Patrons can use their laptops, with free WiFi, after hours. Interior of building has lots of open space and plenty of windows to create a bright and inviting atmosphere. Special area for young adults and a children's room. Unlike the stationary units that currently exist in other branches the shelving will be moveable to allow for re-configuration.
    Construction Progress: Construction Progress:

    Kendale Lakes
    What: Kendale Lakes Branch Library
    Where: 15205 SW 88 Street
    Building Size: 15,000 square ft.
    Estimated Opening Date: Fall 2008
    Estimated Cost: $ 7 million
    Computers: 32 PC's & 20 laptops in a WiFI environment.
    Self-checkout Terminals Patrons will be able to check out their own books.
    Special Features: Situation directly on North Kendall Drive, this branch will feature a unique window display which will be used to showcase book displays and upcoming special events. As you enter the building, areas of the walls are accented by stone tiles and a large gallery wall which will display art exhibitions. With an abundance of windows for natural light, the library is accented by the beautiful outdoor green space. The outside extension will have a canopy under which children programs will be held. In addition to the large children's room, the branch features ample "people space" for lap top use. A separate entrance to the auditorium will provide privacy for meetings and after hour events. Patrons can also use their laptops, with free WiFi, even after hours. Book shelves will be moveable to allow for re-configuration.
    Construction Progress: Construction Progress

     Kendale Lakes
    What: Pinecrest Branch Library
    Where: 5835 SW 111 Street
    Building Size: 15,000 square ft.
    Estimated Opening Date: Fall 2008
    Estimated Cost: $ 3.5 million - interlocal agreement between MDPLS and the City of Pinecrest
    Computers: 36 PC's & 20 laptops in a WiFI environment.
    Self-checkout Terminals Patrons will be able to check out their own books.
    Special Features: The Library sits adjacent to the Pinecrest Community Center and is connected by a covered pathway. The large vaulted ceilings will offer an abundance of natural light where patrons can sit at café-style stools and use laptops. There will be a comfortable seating area for and the children's room is large and open. An auditorium properly equipped with sound will be available to hold meetings and events A gallery wall will display library artwork. With a great deal of open space and light, the space library will be bright and inviting. Unlike the stationary units that exist in other branches, shelving will be moveable to allow for re-configuration.
    Construction Progress: Construction Progress

    Kendale Lakes
    What: Virrick Park Branch Library
    Where: 3255 Plaza Street
    Building Size: 3,100 square ft.
    Estimated Opening Date: Summer 2008

    Interlocal lease agreement between MDPLS and the City of Miami.
    Computers: 8PC's & 6 laptops in a WiFI environment.
    Self-checkout Terminals Patrons will be able to check out their own books.
    Special Features: A beautiful stained glass motif throughout the branch integrates the design from the adjacent park. This branch focuses on children and incorporates the green area of the park. Patrons can also use their laptops, with free WiFi, even after hours. Special area for young adults and a children's room. Unlike the stationary units that exist in other branches, shelving will be moveable to allow for re-configuration.
    Construction Progress: Virrick Park Branch Construction Progress

    naranja rendering
    What: Naranja  Branch Library
    Where: 14850 SW 280 Street
    Building Size: 7,500 square ft.
    Estimated Opening Date: 2009
    Computers: 32 PC's & 20 laptops in a WiFI environment plus three print kiosks.
    Self-checkout Terminals Patrons will be able to check out their own books.

    Palmetto Bay
    What: Palmetto Bay  Branch Library
    Where: 17641 Old Cutler Road
    Building Size: 7,500 square ft.
    Estimated Opening Date: 2009
    Computers: 10 PC's & 10 laptops in a WiFI environment plus one print kiosk.
    Self-checkout Terminals Patrons will be able to check out their own books.
    Construction Progress: Palmetto Bay Construction Progress
     
     


    up arrowTop
     
    space space
    space
    This page was last edited on: May 7, 2008
     
    space
    Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
    © 2007 Miami-Dade County. All rights reserved.
    Miami-Dade County Logo